banner

3-layer PE Coating Extrusion Line

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-12 22:04

  • Browse the number:

    252

Send an inquiries
Company Profile
Qingdao Huashida Machinery Co.,Ltd
By certification [File Integrity]
Contact:

qdhuashida(Mr.)  

Email:

dana@qdhsd.com

Telephone:

+86-532-8099-9083

Phone:

13608977881

Area:

Shandong

Address:

Digital Technology Center A1210, Haier Road, 63rd, Laoshan District, Qingdao City, Shandong Province

Website: http://www.hsdextrusion.com/ http://qdhuashida.overseas-property-news.com/
Product details

Production description

Qingdao Huashida  Machinery Co., Ltd. On the basis of absorbing advanced technical and innovative ideas, It has researched and developed 3PEcoating production line. It indicating the direction of the 3PE coating production line with high performance.

The composition of 3-layer PE coating production line
The three -layer PE anticorrosion structure includes fusion bonded epoxy-powder bottom layer, polymer adhesive middle layer and polyethylene top layer. The epoxy powder is a kind of thermosetting nontoxic coating, forming the high molecular weight cross-linking structure coating after solidifying, featuring, featuring good chemical anticorrosion and high molecular mechanical properties. The function of epoxy-powder bottom layer is to form continuous coating, providing excellent and cathodic disbanding resistance. 

The function of polymer adhesive is to agglutinate the epoxy powder before gelation, and to agglutinate the polyethylene top layer, which unites all three layers together. The three-layer PE process, with the epoxy powder coating as bottom layer, binding and bundling through polyethylene PE and adhesive, is widely used in anticorrosion of steel pipes at home and abroad, and applied to the oil pipeline and gas pipeline, as well as to the gas supply and water supply for civil use.

Technological processes
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, s end→unload pipes

Circumstance condition

Location temperature installation capacity available material
Indoor 0-30ºC Approx 1650KW FBE powder


working conditions:

Power source Installation capacity Consumption of recycling cooling water
Approx 1650kw 3 phase 380v(-10%,+5%)50HZ ≤15ºC,0.15-0.2Mpa,0.5m3/min